Hello all,
We have WoodWard DSLC and MSLC and experience some problems whit the kvar.
Someone know if the DLSC control the PF in the load and unload ramp?
We experience reactive KVAR when the machine synchronize and in the unload process. The genset work fine in base load or import / export no problem with the p.f. when the MSLC synchronize to the main, all the genset change from load sharing to base load, in this change the kw begins to ramp to the base load set o.k. no problem but all the genset experience change in the kvar, all the genset absorbed kvar (negative kvar) and all units trip in reverse kvar.
Any comments?
thanks
We have WoodWard DSLC and MSLC and experience some problems whit the kvar.
Someone know if the DLSC control the PF in the load and unload ramp?
We experience reactive KVAR when the machine synchronize and in the unload process. The genset work fine in base load or import / export no problem with the p.f. when the MSLC synchronize to the main, all the genset change from load sharing to base load, in this change the kw begins to ramp to the base load set o.k. no problem but all the genset experience change in the kvar, all the genset absorbed kvar (negative kvar) and all units trip in reverse kvar.
Any comments?
thanks