Dilva
Electrical
- Feb 15, 2024
- 2
Question in zone 22 (dust) is it allowed to install non-certified equipment, however it meets the requirements of industrial equipment such as IP 6x, surface temperature, non-sparking (junction box, switch, luminaires)If possible, what standard does it indicate?