Back Ground:
PWHT is not required by construction code ASME Sec VIII Div-1, however PWHT is required as per client requirement. This is alteration job in which 7 nozzles has to replaced with new one and one nozzle resize from 20 inch to 30 inch. So, only nozzle to shell joint has to be PWHT.
Question:
Localized PWHT calculations (Soak band, Heating band and Gradient control band) covered only Nozzle with pad area (Sketch 01) OR Nozzles including circumferential area (Sketch-02).
Pls respons as per UW-40 & NBIC part-3
Reference Attached Sketchs (01 & 02) and NBIC Part-3 Screen Shot.
Thanks
Fahad
PWHT is not required by construction code ASME Sec VIII Div-1, however PWHT is required as per client requirement. This is alteration job in which 7 nozzles has to replaced with new one and one nozzle resize from 20 inch to 30 inch. So, only nozzle to shell joint has to be PWHT.
Question:
Localized PWHT calculations (Soak band, Heating band and Gradient control band) covered only Nozzle with pad area (Sketch 01) OR Nozzles including circumferential area (Sketch-02).
Pls respons as per UW-40 & NBIC part-3
Reference Attached Sketchs (01 & 02) and NBIC Part-3 Screen Shot.
Thanks
Fahad