Do somebody knows what wave equation I use and how do I use to evaluate the suitability of the Contractor’s proposed driving system. In this case we are going to build two bridges with prestressed concrete piles and the contractor proposed to use a DELMAG D8-22 Diesel Pile Hammer. Anybody??