    Pile Construction Tolerances

    Hi, May I ask if anyone can share a reference for tolerances in concrete piles installation such as tolerance in diameter, cut-off level, deviation from pile center, etc.? Regards,
  2. ABA102

    Hi, may I ask a code related to thi

    Hi, may I ask a code related to this topic, vibration by jackhammer of any machine. thread507-345501
  3. ABA102

    Laboratory test on mechanical couplers

    Hi, I'm in a project where the Specs. required 3 lab. tests on mechanical couplers, can anyone share me a clause in a code stating what are the 3 tests required for mechanical couplers except for tension test?
  4. ABA102

    Waterproofing in pile head

    The application around the pile head is actually a pvc type material with adhesive and a spray membrane over it.
  5. ABA102

    Waterproofing in pile head

    pile head treatment.
  6. ABA102

    Waterproofing in pile head

    @Motorcity I should say pile treatment.
  7. ABA102

    Waterproofing in pile head

    May I ask of how important is the effectiveness of waterproofing in pile heads of bridge pile cap? What can it cause to the pile in worst case?
  8. ABA102

    Stressing report in external post-tensioning work

    @BAretired Encasement or covering of the tendons with suitable mortar will be done only after the stressing is done, for protection and for fireproofing purposes. Tendons are laid crossing in existing slab with around half laid on top and the other half laid under or soffit of slab. At both...
  9. ABA102

    Protective mortar on top of external post-tension tendons

    @Ingenuity Thank you for your response. The tendons actually laid crossing the existing slab section which around half of the length exposed on top and the other half exposed under the slab or soffit. Concrete cutting done by 25mm depth at driveway to concealed and protect the tendons with...
  10. ABA102

    Stressing report in external post-tensioning work

    @ jdcollins Thank you for your response. In fact, stressing report is required for project record.
  11. ABA102

    Stressing report in external post-tensioning work

    Hi, May I ask to experts in post-tension works regarding quality assurance. There is a situation in our project that I require the contractor to provide me a stressing report of stressing external tendons. And they replied that stressing report not applicable for external PT. Can anyone please...
  12. ABA102

    Protective mortar on top of external post-tension tendons

    Hi Experts, We have this situation at our project site due to strengthening requirement of the building, external post-tension system is used as one of the strengthening systems. But there is a case that the tendons laid along the top of the driveway, refer to attached photo. What suitable...
  13. ABA102

    Importance of S-shaped links in core wall

    @ retired13 @ hardbutmild @ KootK Thank you for your informative replies.
  14. ABA102

    Importance of S-shaped links in core wall

    @ hoshang. Thanks for the info. I have also read that article before but I want to know if, links are still required even if there is no seismic consideration in the design? But for additional info, I have attached herein the reinforcement detail...