Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. wangduyu

    Recertify of Exd Heater housing + Exd Conduit + Exd Distribution Box

    We have purchased one heater, one junction box, one conduit, all Exd certified, for conduit with suffix "U". Do we need to recertify the three things as a new product. there is confusion from description in IEC 60079-0:2011, Section 16.3 and Section 28.2 Section 16.3, looks like it is OK...
  2. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Hi,georgeverghese, thanks for the case presented. part of those pipe will serve for methanol. our dew point is -70 degress.
  3. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Ha, Zdas04, yes, you are right, it is ok to release C02 freely. We are working in Shipyard on barg, not a site where plant will stand with permit to exhaust, small amout is OK, large amount exhaust of CO2, local authority will think we start to use pressure vessel or compressor, any other set of...
  4. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Good idea to use CO2, but take a lot of effort to recover CO2, we cannot exhaust CO2.
  5. wangduyu

    Sour service vs sweet service in pipeline design and pump selection

    Farhadsh, quite difficult situation, in crude oil, Sulfur is in many different forms, pure S, H2S, S02 and some other RSH and so on. But if the lab is certified to issue such number as reference, it is good news. Keep some space for poor quality crude oil, when you select material, one day...
  6. wangduyu

    Sour service vs sweet service in pipeline design and pump selection

    Is there any data regarding H2S Percentage provided by crude oil vendor? that one will be your basis for design. The mixture of crude oil, including the H2S percentage, shall be availble before the refinery designed, even if the crude oil goes into the process line is a mixer of serveral...
  7. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Yes, water will be the first option for pipe clean, effective and safe. But we have to use air because the pipeline is cryogenic, to avoid difficulty to low the daw point before commissioning. Thanks everyone for input
  8. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Thanks EmmanuelTop for the good document, I will keep on search in API standard, look like there is no such criteria. Once I found, I will come back here to post it.
  9. wangduyu

    15 ft/s speed limitation in liquids

    Think about valves, it will be also difficult to close valve in such high speed.
  10. wangduyu

    Acceptance Criteria for Air Blow in API standard

    Hello, is there any acceptance criteria for air blow to clean the pipe line, clearly specified in API standard? Thanks a lot.
  11. wangduyu

    Pump run with high Viscosity liquid

    Thanks, LI and BI, powerful evidence.
  12. wangduyu

    Pump run with high Viscosity liquid

    it is ITT centifuge pump, with head 44.8m, flow rate 5m3/hr, oil density similar to water. I also think it is an experience value, coming maybe from experiment. how to prove it to client is a question.
  13. wangduyu

    Pump run with high Viscosity liquid

    Dear all, We have a pump for hot oil with Dynamic viscosity 0.55mPa.s in 220C, for cold test run, we will have cold oil with Dynamic viscosity 8.12mPa.s. Vendor information shows that when Dynamic viscosity is less than 20mPa.s, it will be ok. I wonder where it comes the conclusion of 20mPa.s...
  14. wangduyu

    HP seperator volume design

    Thanks, with example from surfaceequip website, I believe that, giving Feed gas property, including pressure, temp. Flow rate, percentage of content, experience vendoer procvide solution, including PSV etc. Maybe manufacturer can do more than that.
  15. wangduyu

    Meaning of Trim Line

    thanks,LI and Pennpiper, what I mean is for vessel. Now I understand.
  16. wangduyu

    Meaning of Trim Line

    Sorry, any one can explain, the meaning of Trim Line, and function. Thanks a lot~
  17. wangduyu

    Why do we allow leaking during testing the down hole safety vAlve

    Maybe, Safety Valve, is not Control Valve, so whether the valve will function in emergency is key point for test, not for leakage.
  18. wangduyu

    HP seperator volume design

    Thanks BI & LI. Yes, to save cost, perform pre-treatment is important, make the 2-phase flow stable.
  19. wangduyu

    HP seperator volume design

    Hi, I am working on a HP seperator for LNG feed gas, I wonder what is the input and how to decide the volume and width/longth of HP seperator(vapor and liquid). Anyone have good answer? Thanks a lot.

Part and Inventory Search