  1. tarekzad

    land reclamation from Onshore

    Dear Engineers and Consultants We are an earth moving company (mainly work onshore earth moving) most of our projects are: roads, dams, cut & fill tunnels, mass site grading, and soil transportation (as a result of cut & fill), in the pursuit of business diversification, we are looking to...
  2. tarekzad

    Lattice horizontal Boom as a chute Gallary

    We intend to transport a substantial volume of soil (backfilling and embankment material) over a considerable distance. Our approach involves designing a spreader machine equipped with an extended boom. The boom will be constructed as a lattice horizontal/inclined gallery to support an open...
  3. tarekzad

    Belt Conveyor Rule of Thumb Specific energy (kWh/t.km)

    Dear Little inch There is no calculator and the mail form that you have to fill out to request the calculator doesn't work Tarek Barham +971563188219 tarek@zadconsult.com
  4. tarekzad

    Belt Conveyor Rule of Thumb Specific energy (kWh/t.km)

    Dear DVD the application of the conveyor will be for raw material handling (excavated soil ) so it is not a mining nor a cement nor a crusher. the flights and segments of conveyors shall be movable /Shiftable Tarek Barham +971563188219 tarek@zadconsult.com
  5. tarekzad

    Belt Conveyor O&M [operation and maintenance ] Cost index

    Dear Engineers and expert I'm conducting a feasibility study for replacing the classical wheeled/truck hauling system with a conveyor belt. I have to find a reliable value for all Belt Conveyor O&M activities [operation and maintenance ] 1- Energy (Electricity ) as Kwh/Mt/Km kilowatt...
  6. tarekzad

    Belt Conveyor Rule of Thumb Specific energy (kWh/t.km)

    Dear DVD surly we are not planning to have the 10 KM of belt conveyor as one flight, actually, it will be divided to 300 meter or 700 meters flights the aim form my questions is: we need to check the feasibility of belt conveyors over truck transportation, the main cost of operation in...
  7. tarekzad

    belt Conveyor Specific Energy Consumption

    My company is planning to invest in building a Soil Belt conveyor (Overland Conveyor) moving soil ( sand ) from point A to point B, Belt conveyor overall distance = 5,000 meters Number of Links: Each belt is 700 meters long, then all belt spools out the material by feeding Chutes belt...
  8. tarekzad

    Deep and Wide Trenching in Swamp Land

    Dear HTURKAK it is good to know that you are in Saudi Arabia, please let me know how I can contact you. and of course i have to say thanks for your contribution on this thread Tarek Barham +971563188219 tarek@zadconsult.com
  9. tarekzad

    Deep and Wide Trenching in Swamp Land

    We are doing 5.3 Km Excavation for a 150 meter width trench and 35 meter depth the area is swamp (called sabkhah in KSA) and we are looking for a marshy land consultation and equipment selection the volume of earth overburden is colossal as it is 20 Million M3, and the soil is silty sand we...
  10. tarekzad

    Ropeway Conveyor Belt (FLYING Conveyor)

    We are moving more than 1.5 Million M3 of rock (with size 2" to 5") from high altitudes as the upper plateau to the lower plateau. We are using the road for wheeled and truck haulage over using 2.5 KM road , however, the aerial distance is 760 meter We are looking for an experienced design...
  11. tarekzad

    ???-170 equivalence according to DIN or ASTM Code

    Dear Metal Experts I heard that Russian metal ВКС-170 having high wearability and could be a good solution for hydraulic hammer chisel, please let me know if somebody has good expereince with this metal? and what would be the equivealnt code of ASTM or DIN? Tarek Barham +971563188219...
  12. tarekzad

    Max Hardness of Hydraulic Hammer Chisel I can get in the market

    EdStainless I think you have Stainless memory not a rusty one. thanks for your support Tarek Barham +971563188219 tarek@zadconsult.com
  13. tarekzad

    Max Hardness of Hydraulic Hammer Chisel I can get in the market

    Dear EdStainless Please share the name of the FOUNDRY Tarek Barham +971563188219 tarek@zadconsult.com
  14. tarekzad

    Max Hardness of Hydraulic Hammer Chisel I can get in the market

    Dear Dik Thanks for your elaboration, I totally agree with you. Is there any material crossing your mind? Tarek Barham +971563188219 tarek@zadconsult.com
  15. tarekzad

    Max Hardness of Hydraulic Hammer Chisel I can get in the market

    [highlight #CE5C00][/highlight] Dear Expert in rock-breaking What is the maximum hardness of Hydraulic Hammer Chisel I can get in the market? from where ? and how much will cost? is there any ready-made solution for re-shaping the tip ( H or V Wedge Shape )? What is the easiest solution...
  16. tarekzad

    Excavator Jack Hammer Chisel material

    Dear Engineers and Expert We are doing 1.5 Million M3 of Rock Cutting in a Rosy granite rock at a high altitude (2400 meters), we have a high consumption of Chisels since it looks like we are using 40 or 42 CRMO or even less, obviously, these materials can be good for soft and mid hardness...
  17. tarekzad

    Asphalting Operation into low clear height tunnels

    Dear All I'm looking for an asphalting expert to advise how to deliver the hot asphalt material into a tunnel through an asphalting operation, the tunnel height is low as 5 to 6 meters, which does not allow the big tipper truck to open the dumping jack. The Tunnel length is 2200 meters...
  18. tarekzad

    Asphalt material handling system in low clear height Tunnel

    Dear OSUcivlEng usually, there are NO too many tunnels in Saudi Arabia, there form the classical transportation system is the tipper truck. Due to the height of the Tunnel and the presence of some cable trays and pipes, the clear height is not adequate for the big or medium-sized tipping truck...
  19. tarekzad

    Asphalt material handling system in low clear height Tunnel

    Dear Littel Inch Thanks for your support and cooperation. The problem is not on the import concept, the problem is on the delivery time. so we are to improvise with some material handlings solution like cascadable conveyor belt or cascadable screw conveyor to finish the project on time. Yes...
  20. tarekzad

    Asphalt material handling system in low clear height Tunnel

    Dear Little Inch We are in Saudi Arabia and we don't have such a machine in stock or for rent. On more think, when it comes to rubber belts, I think it won't be standing with asphalt temp. (200 C)? have you tried a reputable brand, so I can start Communicating with. Tarek Barham...