FastReorder_catvba
Nothing happens when running the script but VB editor highlights some lines in redhttps://files.engineering.com/getfile.aspx?folder=197d76dd-57fc-46ce-8d4a-0154a8d6aaab&file=FastReorder_catvba.JPG
Hello.
There are several scripts/apps for resorting but none of them are working. (v5 r2020).
Could you check if they work on your PC.
Thank you.
FastReorder.catvbahttps://files.engineering.com/getfile.aspx?folder=66d416b7-348a-426e-a8fc-56943919213c&file=FastReorder.catvba
Hello.
This macro changes Name/InstanceName of the selected elements (both in Part/Product level).
I am having a trouble running it. Please help with the error.
https://catiavbmacro.com/2018/08/12/change-name-catia-macro/
Thank you in...
Hello.
Could you help to make the following macro:
I have no any PDM tools so I have to convert to PDF my drawings each time.
I've seen macros that add a stamp with the save date when saving to PDF.
Is it possible to do something like that? Or, for example, add updated text to the drawing. I...
...takes years of practice in FEA and that there should be fresh (or strong) basics (at least in Strength of materials).
rb1957,
Beam section - 22mm*40mm. L=200mm..400mm (depends on the lighting unit dimensions).
No, it should be adjustable. (+/- 20*)...
There is a lighting unit mounted on a streetlight pole using a beam and bracket.
Please advise how to make a rough static calculation before testing.
At the moment I believe the strength of the structure is excessive. (sheet metal thickness: bracket - 3mm, beam - 3mm). I would like to evaluate...