Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. rakucheleri

    WPS for a Piping Joint

    Can we prepare WPS for A-106 Gr B pipes Based on a Available PQR done one a Plate ( A-36) in IG position Reference Code : ASME sec IX
  2. rakucheleri

    Bottom Plate Replacement for FR tanks

    Dear IFRs / Bimar thank you for your reply, The tank is situated in india & am not getting a proper fabricator for the work who having wast experience in this field.So i have to take a decision regards the issue. Now we decided to 1) Replace the bottom part by part ie Replacing 25% of...
  3. rakucheleri

    Bottom Plate Replacement for FR tanks

    Dear Experts, This is my first time repairing a open top Floating roof ,Double Deck storage tank designed according to API 650 for Oil Storage., date of fabrication is 1999, this tank suffers from heavily corrosion in Entire bottom plates (according to the inspection report, Entire bottom...
  4. rakucheleri

    Floating roof tank underside Welding

    thanks ,IFRs this is what i want to know .Thanks a lot
  5. rakucheleri

    Floating roof tank underside Welding

    Thanks IFRS Is stitch weld is required on ENTIRE roof bottom sides Or leave it with No weld except the locations where flexure is anticipated.
  6. rakucheleri

    Floating roof tank underside Welding

    How to interpret it Code: API 650 Annex C C.3.3.3: Deck plates shall be joined by continuous full-fillet welds on the top side. On the bottom side, where flexure can be anticipated adjacent to girders, support legs, or other relatively rigid members, full-fillet welds not less than 50 mm (2...

Part and Inventory Search