Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Lithone

    Plastic filters, storage and pressure vessels

    gr2vessels Thanks for the information, lables are the issue or should I say the lack of them. The person I replaced was replace for a reason and I understand one of the reasons was record keeping. Since that API code is for Fiber Glass vessels is there anything for plastic. Again thank you...
  2. Lithone

    Plastic filters, storage and pressure vessels

    Could someone push me in the right direction? I have plastic vessels in a chemical plant some are storage tanks, filters and some are pressure vessels. Is ASME Section X the only place I need to be looking? Does API have something that is simular? What I'm needing is to figure out what the build...
  3. Lithone

    The use of the Appendix E approved welding porceures

    Aburafdi, Thanks for the comment and advice. Dale
  4. Lithone

    The use of the Appendix E approved welding porceures

    Duwe6 Thanks for the confirmation. This forum is nice place to bounce issues off of since I don't have a counterpart to bounce my impetrations off of. Dale
  5. Lithone

    The use of the Appendix E approved welding porceures

    Here is my question: If we would purchase the SWPS (AWS) procedures to replace our 25 plus years old WPS procedures would this require that all our welders requalify to the new SWPS procedures? Reading Section IX Art. V on pages 204-205 is states that the company must run one coupon to qualify...
  6. Lithone

    The use of the Appendix E approved welding porceures

    Here is my question: If we would purchase the SWPS (AWS) procedures to replace our 25 plus years old WPS procedures would this require that all our welders requalify to the new SWPS procedures? Reading Section IX Art. V on pages 204-205 is states that the company must run one coupon to qualify...
  7. Lithone

    ASME SEC IX WPS Requirements for new owner,

    Thanks I'm brain dead and stopped at QW-201 and didn't go to 201.1 for some reason I can't explain.
  8. Lithone

    ASME SEC IX WPS Requirements for new owner,

    We were just puchased by another company. Do we have to added the new companies name to our procedures? I know from what I read we don't have to requalify them but is there anything other than what I asked that we need to do?
  9. Lithone

    ASME Section IX, welder eye test requirements

    That's what I figured. LOL
  10. Lithone

    ASME Section IX, welder eye test requirements

    QCRobert, So how is that working out for them? LOL
  11. Lithone

    ASME Section IX, welder eye test requirements

    Funny Guy. LOL More like being a pain to me, figure I'll let HR deal with it fom here..
  12. Lithone

    ASME Section IX, welder eye test requirements

    Wekdtel and QC Robert, No not concerned with the welders welds but, he seems to be pushing to no longer to be a welder. Me being a Retired-Navy NDT guy I was used to a welder meeting the J-1 Jeger chart vision test requirements and not being able to identify any requirement had me thinking I was...
  13. Lithone

    ASME Section IX, welder eye test requirements

    Nasir, I couldn't find one, either. I know that US Mil-STD's and AWS have them, but nothing in ASME other than ones for NDT/NDI/NDE inspectors. Thanks for the second look. Dale
  14. Lithone

    ASME Section IX, welder eye test requirements

    If anyone knows where in the section IX I can find something about Eye testing requirements for welder could they please direct me. I've beeen through the standard and I am unable to locate any requirements. Thanks
  15. Lithone

    structures inspection in a chemical plant

    Sorry, For the Plant structures themselves, meaning the supports for catwalks, vessels, piping racks.
  16. Lithone

    structures inspection in a chemical plant

    Hey, Guys, Here is a question for you does anyone have any sort of guideline or inspection sheets for conducting the inspection of chemical plant structures in the USA. The Chief engineer came to us today and asked us about a five year inspection; we were not aware of anything and they did not...
  17. Lithone

    AWS vs ASME IX welding procedures.

    Al, Ok, I did check and see which ones that applied to our work in the sec IX. But I guess I need to go back and read some more about the demonstration requirements. Thanks for the input, it's great to have another point a view, since I'm the only one here that has any sort of welding knowledge...
  18. Lithone

    AWS vs ASME IX welding procedures.

    I'm looking to update our welding procedures. We are a chemical plant with both product and power piping.The reason I'm replacing them is because they were all proven in 1981 or 1998. All of our work is covered in ASME B31.1 and B31.3 or an API. This part is all new to me, I'm reitired US Navy...
  19. Lithone

    ASME welder Qualification

    Fizza, thats make very good sense to me. Thanks for the help.
  20. Lithone

    ASME welder Qualification

    To start with I'm a fromer Navy NDT inspector and ASME is really a lot less restrictive. I'm in a learning curve. LOL My question is where exactly are the acceptance information of a welders qual? I really didn't see out right accepatance in the Sec. IX or V. I'm trying to detremine max weld...

Part and Inventory Search