  1. rt06

    Masonry control Joint .. or not

    Thank you all for the valuable info. It is interesting to know different constructions in different areas.
  2. rt06

    Masonry control Joint .. or not

    Thanks Jed and Larsacious for the input. I have similar experience ( I am at south). However, I heard that in west coast where seismic loads necessitate large horizontal shear reinf (say bond beam spaced at 16 or 24 inch), the control joint is rarely used. Any folks from California can confirm...
  3. rt06

    Masonry control Joint .. or not

    Typically in CMU load bearing wall we place vertical control joint every 20 ft or so. Has anyone have the experience to reinforce a wall based on TEK 10-3 to increase spacing between joints (say 120 ft)? In a recent projct the Arch is asking so but I am hesitating to blindly follow TEK 10-3...
  4. rt06

    What is this moasnry unit.

    Ok, I found it in Brick Tech notes 3A...
  5. rt06

    What is this moasnry unit.

    Thanks. Do you know where I can find some mechanical properties of the structural clat tile?
  6. rt06

    What is this moasnry unit.

    Thanks. I have not gotten a chance to take one unit off and see the other side. What difference will it make if the other side is smooth vs not smooth? Thanks again
  7. rt06

    What is this moasnry unit.

    Please see attached picture I took for an existing masonry wall. I think it is Terra Cotta but not sure. Does anyone know this? Also, do you know what kind of tensile strength this type of unit has? I am trying to place some anchor in it. Thanks,
  8. rt06

    Cut an existing prestressed beam

    Ikjh345, thanks for the help!
  9. rt06

    Cut an existing prestressed beam

    Yes, it is what I am going to do, and is what I am worring about. For unbonded tendons we are surely not able to do this. But for bonded tendons I am hoping it is fine and there will be no "explosive" failure. But I am not sure of this. Is there anybody who has done it before? and is there any...
  10. rt06

    Cut an existing prestressed beam

    Thank you all for the suggestions. I will check the forces/deflection for the remaining spans, the development length of the tendon, etc. I might need to come up with some strengthening scheme for the remaining spans, I might have to design them as Class C instead of Class U members. Thanks.
  11. rt06

    Cut an existing prestressed beam

    I have an existing multi-span prestressed (bonded) concrete beam. I need cut a big opening in the interior span, which means I will lose one entire span. Does anybody have some experience in cutting existing prestressed beam? I think it is doable since the PT tendons are bonded to the concrete...
  12. rt06

    SE II test

    Thanks Haynewp and JAE for the valuable information.
  13. rt06

    SE II test

    I am working as a structural engineer in Texas. I will take SE I test this month. I would like to take SE II test next spring. Does anybody know whether there is any requirement for taking this test? Do I need to go to California to take the exam? I asked Texas board this question but they are...
  14. rt06

    Wrong Column Rebars Splice Location

    Without knowing details of your structure system, I guess your 40-story building is unlikely to be purely special moment frames. Is it a dual system ? Maybe you can look into changing the type of your concrete moment frame and see if it works (I am not familar with high seismic zone building...
  15. rt06

    what exactly is harmful about a little net uplift at a frame column?

    During preliminary lateral design, your column in tension is a good index that your building is either too light or too slim that it might have stability problem. It might be fine but on the other hand it leaves you not much room to play in the CD design, and every body knows how much the...
  16. rt06

    China Bridge Fails

    1)The bridge is a concrete (or CMU?) arch bridge, which is a traditional bridge system used in China. They are still trying to figure out what went wrong. But I do not appreciate the attitude to quickly jump to criticize all the construction works (and other products) done in China. I am sure...
  17. rt06

    ACI 05

    scottiesei: Are you asking about ACI 530 MSJC? Their lap length for masonry is different from ACI318 for concrete. I did not get a chance to compare them though, but I suspect for masonry the splice length will be longer.
  18. rt06

    Boundary Elements for Shear Walls

    Using general section, define the vertical rebar yourself and let etabs check your design.
  19. rt06

    Masonry Lap Splices

    The new code requirement is based on review of available test data. But the problem is the test data is not enough and masonry material itself is so variable. I believe ACI 530 committee is aware of this and they are working to improve it. Hopefully the improvement will show up in the next...
  20. rt06

    punching shear

    When checking punching shear moment is always an issue. Try to use FE program such as RAM cincept or Adapt builder to obtain two-way moment and use them for design. Also, watch opening next to the column