Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Contech2011
  • Order by date
  1. Contech2011

    Surface Blemishes

    Do you have any other name other than surface blemishes? And possible reasons please...
  2. Contech2011

    Concrete Spalling after deshuttering soffit

    Both formwork was left for 23 days before deshuttering.. No form release was used. The dark color is of deformed bars spaced at 150 mm c/c. Yes, the structure is a transverse slab... We think it is a cold joint which probably occured after fresh concrete was poured on a very small layer of dry...
  3. Contech2011

    Concrete Spalling after deshuttering soffit

    The second picture was missing... please check this pic of spallinghttp://files.engineering.com/getfile.aspx?folder=8db0b60f-0e1d-439b-b1ad-8d68c90161fc&file=10102011066.jpg
  4. Contech2011

    Concrete Spalling after deshuttering soffit

    Hi, We have observed spalling of concrete upon de-shuttering the soffit formwork after 25 days. The concrete slab is 2.0 meter thickness and was poured using 45 Mpa mix with 35% flyash to meet heat of hydration requirements as the thickness is 2.0 meters. Test cylinder samples have achieved...
  5. Contech2011

    Classification of crack

    Mr. Ron and others your comments plz on my last post...
  6. Contech2011

    Classification of crack

    Thank you for your valuable comments. The pic is not from my other recent post. This concrete was casted a month ago using static pump. The slump ex-pump was 100-120mm. You are absolutely right that these cracks could have been closed while they are still plastic, but masons keep complaining...
  7. Contech2011

    Classification of crack

    Hi All, Please classify the crack shown in the uploaded pic. Other data is as below, 1. Concrete grade 45 Mpa (490 Kgs cement) 2. Pumped @ 100 meters 3. Initial water curing not done. Curing membrane was applied late. 4. Slab thickness 40cm & 70cm. Also recommend measures to control such...
  8. Contech2011

    Shrinkage Cracks

    SLab is 300mm thick..A superplasticizer was used Conplast SP430R @ 2% by wt of cement. Cement content is 490 Kgs/cum. No retarder was used...The crack is still not inspected from the bottom as shutters will be opened after 14 days... We hope it is not thru-n-thru crack.
  9. Contech2011

    Shrinkage Cracks

    The concrete is normal weight. Slump measurement was taken ex-truck and then pumped by placing boom. What shall be the sequence of finishing operations immediately after pouring? When shall the water be sprinkled? When the concrete did not attain its initial setting (upto 3-4 hrs) how can the...
  10. Contech2011

    Shrinkage Cracks

    Hi All, We have a situation where early shrinkage cracks occured after 1-2 hours of the concrete was placed. Enclosed are the pics of these cracks. The grade of concrete is 45 Mpa (flow upto 600mm) and was pumped up 16 storeys by placing boom. Ambient temp was 41 deg centigrade max.. concrete...
  11. Contech2011

    PFA and microsilica based concrete

    Loading rate, calibration was verified before testing and found okay. samples were cured in laboratory conditions. Mix has 5% silicafume, 35% PFA (Type F), and remaining Type I OPC. Microslica with HRWRA will get us initial strengths in PFA based mixes, but why is later strength gain is...
  12. Contech2011

    Concrete Measurement

    Hi All, We tend to ignore the volume of heavy rebars in any structure while ordering the concrete. Given that the yield of the concrete is allright, there remains some difference between theorotical quantities ordered (based on the dimensions from the drawings, offcourse) and the actual...
  13. Contech2011

    PFA and microsilica based concrete

    I got shocker of my life to know the compressive strength @ 60 days of a 45 Mpa mix containing 35% replacement of cement with PFA (Type F C618) and about 5% of microsilica C1240, to be almost equal to 28 days strength. Only minor increase of 2 Mpa has occured @ 60 days. I reckon the cause to be...
  14. Contech2011

    Air content

    Hi, How much to consider % entrapped air in a cement:sand mortar mix per cum in the mix design?
  15. Contech2011

    Sand Equivalent Test Vs Silt Content Test - Concrete Durability

    Hi, What is the difference between sand equivalent test values and sa simple silt content test?I mean when you finish a SE test, specs say that min 75% SE value is accepatable, which means max 25% of clay/silt content is acceptable limit for sand used in structural concrete! But other specs say...
  16. Contech2011

    Plaster Mix

    Yes, we are to use OPC cement with sand and it is internal plaster. I am still not clear. plz advice.
  17. Contech2011

    Plaster Mix

    Hi, To calculate proportions by weight of a plaster mix 1 : 4 by volume we need to multiply the dry densities of cement & sand with the volume proportions. How much cubic of fresh plaster mix does it give you after mixing with water say W/C = 0.45 ? Absolute vol method of calculating the...
  18. Contech2011

    Sand Equivalent Test Vs Silt Content Test - Concrete Durability

    Hi, What is the difference between sand equivalent test values and sa simple silt content test? I mean when you finish a SE test, specs say that min 75% SE value is accepatable, which means max 25% of clay/silt content is acceptable limit for sand used in structural concrete! But other specs...
  19. Contech2011

    Admixture Dosage ??

    Hi there, We have a different mixes with cement varying from 400 to 480 Kgs/ cum. The W/C is kept constant = 0.35 for all the mixes. The mixes are like this Cement W/C %Dosage 400 0.35 0.5% 420 0.35 ?? 440 0.35 ?? 460 0.35 ?? 480 0.35 ?? Now, the first...
Back
Top