Yes, an 8" pipe can be driven to rock, but will require predrilling.
Open ended pipe will require same energy to drive as closed
end pipe. Both will refuse long before you reach t/r.
You could Predrill the hole to rock, install an 8" can in the upper 20 foot to stiffen the pile up...