Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. DanTh3Man

    A106-B vs A333-6 piping material

    A333-6 and A106-B are the same material, aren't they? The A333 is meant for low temperature service and requires additional impact testing.
  2. DanTh3Man

    Recip Pump - Falling Discharge Pressure with Increasing Suction Pressure

    They discharge into a common header. Each pump has a check valve before the flows re-combine.
  3. DanTh3Man

    Relationship between pump discharge piping length and pump flow

    Yeah, they did a flip-flop. You already answered their original question.
  4. DanTh3Man

    partially close ball valve for receiving pig

    Without careful selection of the valve and design of the downstream piping you're going to have a problem. Operating a ball valve in the partially open position will direct the flow to either the valve body, the flange, or the downstream piping wall instead of down the bore of the line. This...
  5. DanTh3Man

    Relationship between pump discharge piping length and pump flow

    Yes, the pump will cavitate if you don't have enough NPSH. Depending on the pump the friction losses in the suction piping can be enough for the suction head to fall below NPSHr.
  6. DanTh3Man

    thickness of spade less than pipe class requirements

    Could you replace the valves with DIB valves? Or is there confined space work downstream?
  7. DanTh3Man

    Recip Pump - Falling Discharge Pressure with Increasing Suction Pressure

    Thanks for the input, that was my thought as well. Always nice to know other have similar thoughts before telling them to shut 'er down.
  8. DanTh3Man

    PWHT per B31.3

    Also note that there can be other, non-code requirements for PWHT. One such example is concerns around mitigating stress corrosion cracking in sour service.
  9. DanTh3Man

    Piping Hydrotest After Alignment with Rotating Equipment

    If this is an ASME B31.3 system the spool would need to be re-hydro'd unless: You use a closure weld (and the jurisdiction allows it) It is new construction and you follow the requirements of B31.3 para 345.2.6 (i.e. owner waives the requirement and appropriate precautions are taken
  10. DanTh3Man

    Recip Pump - Falling Discharge Pressure with Increasing Suction Pressure

    Hello, I'm troubleshooting a pump system and am hoping the community here can provide some insight into what kind of issue I might be dealing with. First some background: System consists of two parallel centrifugal pumps feeding two parallel recip pumps Centrifugal pumps are on VFDs but have...
  11. DanTh3Man

    telltale hole / vent hole/weep hole

    Weep holes should always remain open. If you plug it off you have basically added a lap patch to the vessel which can be very dangerous.
  12. DanTh3Man

    NACE MR 0175/ ISO 15156 REQUIREMENT

    Could you shed some light on why you think fresh water is going to be sour?
  13. DanTh3Man

    Redesign of existing 12F tank to comply with API 650

    Hello, I have been asked to look into whether or not it is possible to redesign/re-certify existing storage tanks that were designed and constructed to API 12F to be compliant with API 650. My initial feeling is that this will not be possible due to the more stringent examination requirements...
  14. DanTh3Man

    Rerate Pressure vessel from 1968

    If you are worried about it find the allowable stress values from each edition of the code and use the smaller value.
  15. DanTh3Man

    Required bolt loading for channel head to shell connection with fixed tubesheet in between

    Thank you for the reply Mike. Now that you have mentioned that paragraph I feel quite silly for missing it. I am accounting for ribs as per TEMA RGP-RCB-11.7 Pass partition rib area. I will also look at applying PCC-2 Appendix O to this issue and see what I can come up with. Regards, Dan
  16. DanTh3Man

    Required bolt loading for channel head to shell connection with fixed tubesheet in between

    Hello, I am trying to determine the bolt loading requirements for the channel head to vessel shell connection on one of our heat exchangers. There is a fixed tubesheet between the two flanges. Searching for an approach to calculate the bolt loading requirements for this type or arrangement...
  17. DanTh3Man

    ASME PCC-2 6in welding distance requirement

    I got it all sorted out, I had missed the part about the patch for nozzles under a certain size not needing to be any larger than twice the diameter of the nozzle. We had the weld between the nozzle and the shell crack. The crack really turned into a hole as it was more than 1/4" wide in some...
  18. DanTh3Man

    ASME PCC-2 6in welding distance requirement

    I've got a question along these same lines. I had a weld on a nozzle fail and am looking to repair it according to article 2.1 however there is another nozzle 6" away from the first. I am worried that installing a patch so close to the other nozzle weld will lead to another failure. A little...
Back
Top