Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. majbacker

    16" pipe under existing wall footing

    All, Thank you for the replies and sorry for the delay in response. I've been working like A dog to meet this deadline. I have attached a drawing with my current approach...
  2. majbacker

    16" pipe under existing wall footing

    I'm doing a project where I need to install a 16" chilled water distribution water pipe below an existing wall footing. The existing foundation wall supports an enclosed walkway one story tall(walkway walls above grade are concrete and i think the roof is timber). The walkway is about 8' wide...
  3. majbacker

    Directional Drill Under Narrow Building

    Hi All, I am the civil engineer on a project where we are installing below grade chilled water distribution pipe for a VA campus. A part of the pipe run needs to be routed below the foundation of an existing enclosed walkway (block walls concrete foundation and roof)the walkway is about 12'...
  4. majbacker

    LVL Lateral Support

    Thank you all very much for your responses. This has been bugging me for a long time and it is great to have other professional opinions on the matter. Greatly appreciated!
  5. majbacker

    LVL Lateral Support

    Lol well judging from your threads you have plenty of experience and I think that makes sense. It is a 3-ply beam which gives the beam a total width of 5.25". The two spans are approximately 10' and the beam supports two floors. Trib width on first floor is about 13.5 ft and same for second...
  6. majbacker

    LVL Lateral Support

    I agree. I am in a bit of a stick situation as the client wants to keep this as a drop beam. I have also recommended a deep saddle type connection but that was a no-go for them too. It seems like I have two options: 1. Run the beam as only being braced at each end and not the middle. This...
  7. majbacker

    LVL Lateral Support

    I am using forteweb to analyze a multi span LVL basement beam. The beam is a drop beam and is pocketed into the foundation walls at each end. The center support is a steel column. Forte has an input for bottom edge lateral bracing. I am assuming there would be no lateral support at the bottom...
  8. majbacker

    Gas Station Site Design

    Thanks for your reply everyone. I am a Licensed engineer with several successful site designs under my belt. Just had never Laid out gas pumps before and wasn’t sure if there were considerations for fire suppression among other things. It does make sense to take a look at existing layouts and I...
  9. majbacker

    Gas Station Site Design

    Better questions? Thanks I have already searched Google. Measuring one is a good idea but I don’t want to ruffle anyones feathers. Perhaps I could check one out that is closed.
  10. majbacker

    Gas Station Site Design

    Does anyone have a good reference to lay out gas pumps for a gas station? Like how far apart pumps should be, what overhang the canopy needs to be around the perimeter etc.

Part and Inventory Search