Hi,
Could you please suggest which 2" NPTF check valve is suitable for compressed air system? Swing check valve or ball valve? Please advice.
Thanks,
BN
Hi,
We have received a query to make rectangular fuel tank and specs are below. Please assist me to calculate vent size for this tank.
The 500 bbl rectangular storage tanks would consist of the following:
> Tank design as per good engineering practice and structure to comply STAAD Pro...
Hi,
As per our client spec there is no detail about groove inlays for API 6BX flanges and we placed the material orders without inlays. Is it ok? The flange material is AISI 4130 and gasket material is SS16.
Thanks,
BN
Hi,
Flow medium: 15% and 28% Hcl Acid
Working pressure: 10000 psi
Flow rate: 60 bbl/min
Working Temp: Max 50 deg C, Min -10 Deg C
What would be the suitable piping material and MOC for valves?
Our driven pulley dia is 23.5" and it sould have 940 rpm to acheive the required output. Drive pulley dia and speed have been calculated as 12.5" and 1800 rpm in order to acheive our output in driven pulley. Now the question is how to calculate the required minimum distance between two pulley...
Hi,
I want to know why wire line unit is being used in drilling rigs? I saw a wire line unit spec, as per that the wire dia. is 0.103" and length is 23,000 ft. My question is, on what basis the dia. and length have been fixed? Is there any calculation or thumb rule?
Thanks,
BN
Dear Engineers,
We are using a fabricated Cross 6” x 6”,Sch 80 on the inlet and outlet side of the manifold,Working pressure is 1440 psi.Can you please tell me how to check(calculation) if this design is passing? MOC A234 WPB. Pic is attached for your...
Dear All,
Last four years I have been working as Piping Engineer in offshore jack up rig projects. Now I want to work in petro chemical plant piping projects. I tried hard but I could not get any offer.I am really confused & depressed. your valuable suggestions will help me.
Thanks,
BN
Hi all,
Last three years I have been working as piping engineer in offshore and marine projects (Esp for jackup rigs). Now I want to work in petrochemical plant piping projects. You all know both are different.What should I do to get into petrochemical plant projects.Please advice.
Thanks,
BN
We need to install burner boom in offshore rig, which has the capacity of handling 16000 BPD or 120 MSCFD,100% burn. We have to provide compressed air line to burner boom. So We need to place a compressor with sufficient air volume and pressure to allow burners to function at a maximum rate of...
Hi,
We are having a pressure bladder tank which has been designed for 10bar. But the problem is pressure relief valve is not mounted on the tank. But the maximum discharge of the pump is only 7 bar and the pre-charge air pressure s 2bar. SO the pressure will never go beyond the bladder tank...