Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Klitor

    Bending Moments in Slab after introducing the secondary beam

    Try putting in stiffenes modifier for the beam (say x10 stiffness in bending) and see what happens
  2. Klitor

    Approx. 300 sq ft, 19 ft suspended architectural ceiling

    Something like this. Only green verticals could be in compression and would therefore need to satisfy kL/r<200https://files.engineering.com/getfile.aspx?folder=af54cbb1-f366-4dda-8fa6-45d232d8a4fa&file=IMG_20240804_131900.jpg
  3. Klitor

    New Concrete Pedestal to Existing Concrete Interface

    +1 If its a short pedestal, steel skid placed directly on existing concrete could be a simpler solution.
  4. Klitor

    Insulated Panels

    @Aesur Cool reference for AWIP Onedeck...Though I see it requieres fastener every 8" which would be very hard sell on any project. I guess some cross bracing would be much cheaper and less hassle than so many fasteners
  5. Klitor

    Eaves beam in LFRS in a Portal Frame Steel Building

    This would be my choice. "Large" wind loads on front and back would be taken by eaves struts and roof bracing in first and last bay. "LTB" bracing would be done by purlins (and/or fly braces) not pictured on global model. In this scenario cladding is not doing anything (we mostly use insulated...
  6. Klitor

    Is it possible to do a partial fixed base plate? How?

    When dealing with retrofitting of existing structures, some benefits can be gained. Though so far I used it (with ideastatica) only when I was "in my mind" sure the structure is ok, and needed the numbers to prove it. Wouldn expect much from the method though.
  7. Klitor

    S235JR vs S355JR Structural steels

    @kingnero, What I implied is that noone will make a fuss or even bat an eye if you choose s355 over s235 welding-wise (at least on heavy/industrial projects I work on) Heck, as Gforce one also said, its even hard to find some profiles in s235...most vendors will substitute you s355 for the...
  8. Klitor

    S235JR vs S355JR Structural steels

    Kingnero, It is quite general statement. Doubt anyone would let me use s355 if preheat was neccessary for 12mm elements. Preheat woes (also quite generaly..just a structural engineer...have IWE guys in house) start at about 30mm :)
  9. Klitor

    The APA advises against Thermo Ply - are they biased or does the stuff just actually suck?

    Cant blame them. In a way not much has changed over the years. The word for burglar in ancient greece being "wall digger" because of shoddy mud outer walls.
  10. Klitor

    Double Angle vs Shear Tab Connections

    15yrs of European industrial/o&g... Mostly end plates and some double angles for lighter stuff. Never once saw or designed a shear tab.
  11. Klitor

    Effective width for fasteners

    Seems I am also using 4*t in one-off situations. https://files.engineering.com/getfile.aspx?folder=257f1af7-5956-421c-a4ba-9fd9d98ba24c&file=effect.jpg
  12. Klitor

    Concrete Column Above a Steel Beam with no support bellow?

    Edgar, your wrath should probably be directed to architect and owner for this building layout...leading to solution above. 25/25cm is not much of a column to connect 9m long hea260 to...so continuoous beam could be an option.
  13. Klitor

    Drilling Through Raft Slab Rebar - Repair Methods

    They should come up with a better solution for Anchorage. I would understand leaving the 6" pockets on top of raft if it was a new build...but for this...there IS a better way
  14. Klitor

    Dear Engineering Community, I w

    26` high cmu in seismic zone? How thick are the walls?
  15. Klitor

    Connecting a rafter to a shell

    Isnt there a continuous stiffener (top angle) on the other side of shell...on the same elevation as rafters?
  16. Klitor

    Components and Cladding

    FWIW I was involved recently with large PV power plant...those structures are basically canopies, and wind tunnel testing was done for the project layout. Larger "c&c" wind forces were by testing "limited" to happen on 3mx3m area possible to be placed anywhere on the structure. The problem was...
  17. Klitor

    Field welding a bolted splice connection

    Out of curiosity - why are you using such a large end plate instead of 4 small plates (one for each chord)?
  18. Klitor

    Managing Other Engineers

    Are you able to refuse work owners bring on (pass it to some subs/associates)? If quality is an issue you 100% have too much work going on. Id hit the beake pedal a bit (loss of profit) until quality/attitude is sorted for the greater good going foreward If you cant do that, Im affraid it aint...
  19. Klitor

    Need Wood truss engineer for Nevada

    27000 worth of billable hours were uselessly spent on this thread alone :) Just to add something - coming from petroleum/powergeneration background - i cant imagine ever using a truss requering web bracing - didnt know such a thing existed until now :)

Part and Inventory Search