Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. CPGTECH

    NFPA 20 Test Loop

    LCREP, I will verify if the the drainage system is capable to handle the required required flow. Thanks for the response, really appreciated it.
  2. CPGTECH

    NFPA 20 Test Loop

    Thanks cdafd for your response! I'm referring to a flow meter piped back to suction line.
  3. CPGTECH

    NFPA 20 Test Loop

    Thanks LCREP for your response! The meter is not piped back to suction line, it is located before the test header, so the meter flows/discharge to drain. So a metered test loop piped back to the suction line is not required as long a flow meter will be installed to achieved full flow test?
  4. CPGTECH

    NFPA 20 Test Loop

    Hi All! Is there any requirement to provide additional test loop around the fire pump if the system is already equipped with metered test header? Thanks All!
  5. CPGTECH

    Fire barrier for ceiling foam insulation

    The building was designed in accordance UFC (military), so both IBC 2012 and NFPA 101 were used. Fire rating requirements of load bearing assemblies shall comply to IBC 2012. For non load bearing assemblies shall comply to NFPA 101 2015.
  6. CPGTECH

    Fire barrier for ceiling foam insulation

    Thanks cdafd, Currently the design provided a 2 hr rated gyp board ceiling to protect the insulation. The insulation itself is 15 mins rated as required by NFPA 101 for foam insulation. But since the room is required to have 2 hour separation, they said (designer) the ceiling should be 2 hr...
  7. CPGTECH

    Fire barrier for ceiling foam insulation

    Sir's I'm working on a 1-storey warehouse project with multiple fire areas. One of the area/room needs to be separated with 2-hr fire rated construction with the rest of the building. CMU walls were being provided as the 2-hr fire rated separation and they are constructed from floor up to the...

Part and Inventory Search