CPGTECH
Mechanical
- Feb 25, 2014
- 7
Sir's
I'm working on a 1-storey warehouse project with multiple fire areas. One of the area/room needs to be separated with 2-hr fire rated construction with the rest of the building. CMU walls were being provided as the 2-hr fire rated separation and they are constructed from floor up to the roof underside (no gap). The problem arises inside of the room, spray foam insulation will be applied underside of the room. Does the spray foam insulation need to be protected by 2 hr rated drop ceiling?
Thanks and regards,
Cris
I'm working on a 1-storey warehouse project with multiple fire areas. One of the area/room needs to be separated with 2-hr fire rated construction with the rest of the building. CMU walls were being provided as the 2-hr fire rated separation and they are constructed from floor up to the roof underside (no gap). The problem arises inside of the room, spray foam insulation will be applied underside of the room. Does the spray foam insulation need to be protected by 2 hr rated drop ceiling?
Thanks and regards,
Cris