Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. pv_mkk

    In your country, Do they restrict to use material origin from China to build pressure vessel?

    Whenever there is bidding for new project, I always see customers restrict the using of pressure part (especially stainless steel) origin from China to build pressure vessels. This restriction is still remaining like 10+ years as far as I've been in this field. I am wondering that these days...
  2. pv_mkk

    Strength weld+light expansion and light expansion+strength weld for tube to tube sheet joint

    a never ending debate. Follow TEMA tube to tubesheet joint design and you can get rid of the confusion of "light" "heavy" expand thing. TEMA only requires seal weld + expand with groove OR strength weld + NO expand. The rest is depended on your manufacturers' experiences and technique. I go...
  3. pv_mkk

    Is there any update in the lastest ASME Sec8 Div1 that says about thickness check annually?

    Lately, the customer asked to my boss if thickness check annually is required or not? For pressure vessels that are construced by following ASME Sec8 Div1 in general. I never heard of this requirement in the book before. Mostly, it comes from an additional requirement of each customer...
  4. pv_mkk

    Is there any book that provide guidelines for dome roof/flat bottom tank with 340kpa design P.?

    Dear DHURJATI SEN Isn't API 620 for tank with internal pressure <=15 psi (~103 kpa) only?
  5. pv_mkk

    Is there any book that provide guidelines for dome roof/flat bottom tank with 340kpa design P.?

    My client has inquiry about a dome roof, flat bottom tank with internal pressure of 340kpa. The size is gigantic Dia=8m H=5m. (Their existing tank only ATM) I don't think it's practical from my experiences. If I go for Sec VIII Div.1, the thickness will be skyrocket. Is there any book that...
  6. pv_mkk

    Flush Patch With Nozzle Repair

    Looks like, originally, the leakage comes from nozzle-to-shell joint and they go to weep hole. And if you replace new LWN nozzle same size, can you be able to pressurize the tower to confirm no leakage on that joint? If yes, then go ahead.
  7. pv_mkk

    Spiral Baffle inside jacketed vessel (Sec.VIII Div.1 Appendix 9) where to weld it to?

    Dear SnTMan, Do you think there is anything to do about type of fluid in jacket such as hot oil, steam, cold water that affects on where we have to consider to weld spiral baffle to?
  8. pv_mkk

    Spiral Baffle inside jacketed vessel (Sec.VIII Div.1 Appendix 9) where to weld it to?

    Dear r6155, What if jacket design pressure is FV too? Moreover, can we calculate the strength of spiral baffle (acts as reinforcement ring) the same way we do on typical reinforcement ring?
  9. pv_mkk

    Spiral Baffle inside jacketed vessel (Sec.VIII Div.1 Appendix 9) where to weld it to?

    Yes sir, I checked drawings and saw different design on several jacketed vessels. So I just want to understand in which case we have to weld it to shell or in which case we have to weld it to jacket. What I can think of is that most of jacketed vessels I've seen are made of CS jacket + SS...
  10. pv_mkk

    Spiral Baffle inside jacketed vessel (Sec.VIII Div.1 Appendix 9) where to weld it to?

    What condition to decide where to weld spiral baffle (the thin plate to force direction of flow inside the gap between main shell and jacket) to outside of main shell side or to inside of jacket shell side? I cannot find any book to support this. I saw some existing vessels in the same plant...
  11. pv_mkk

    My client would like to seal the gap between shell flange like this, is it ok?

    The reason is 1. The gasket at shell flange is broken and there is some vapor leakage when the media inside was heated. 2. It takes a long time to disconnect all piping and agitator on top of the vessel in order to replace a new gasket. So my client would like to seal the gap between shell...
  12. pv_mkk

    How to repair mislocated bolt hole on pad flange attached to top center of ellip2:1 head

    thanks SnTMan & quadtracker Now proceeding plug welding. Agitator maker doesnt accept to add adaptor. this agitator is kinda special and already fabricated to conform with vessel dimension.
  13. pv_mkk

    How to repair mislocated bolt hole on pad flange attached to top center of ellip2:1 head

    This pad flange should be fabricated as per JIS10K 450A dimension. It is used for connecting with agitator motor. But I just found that bolt holes quantity is not correct (16 holes instead of 20 holes) :( Now the only repair procedure to come up with is by plug welding all hole follow AWS D1.1...
  14. pv_mkk

    I design ob-round sight glass installed on vessel shell and cal FEA, result show very high von-mise.

    Thank you very much prex and everyone. I'm really appreciated your help.
  15. pv_mkk

    I design ob-round sight glass installed on vessel shell and cal FEA, result show very high von-mise.

    I'm not allowed to publicity post full detail drawing. I'm now seeking for the experts also. But I'll try to explain what I've done so far... 1. A vessel as mentioned in topic was already made but with different sight glass design and NO reinforcing pad for sight glass opening. (There is a...
  16. pv_mkk

    I design ob-round sight glass installed on vessel shell and cal FEA, result show very high von-mise.

    Prex, May I have your email address? I will send all detail and story why i'm now struggling on this analysis.
  17. pv_mkk

    I design ob-round sight glass installed on vessel shell and cal FEA, result show very high von-mise.

    Racookpe1978, Refer to this catalog; http://www.papenmeier.de/tl_files/lumiglas/pdf/en/datenblatt/3755.438.00.ovale.eng.pdf I use 10bar model but increase dimension 'h1' to 50mm
  18. pv_mkk

    I design ob-round sight glass installed on vessel shell and cal FEA, result show very high von-mise.

    Compositepro, Customer said their fluid can easily solidified. That's why we have to design like this.

Part and Inventory Search