Hi Guys,
What is the rebar slenderness ratio for all the rebar sizes for T10, T12, T16, T20, T25 and T32?
Your reply is referred to which clause of the standard.
Thanks.
Hi Sir
As per practice, we will carry out maintained load test to verify the pile capacity before carrying out the full string on the working pile. During the maintained load test, the retention load for 200% is 24 hours.
May I know, what is the reason to maintain the 200% load for 24 hours...
Dear Sir,
Could you explain what is the reason for the wind pressure on building the design return period must be 50 years? Why cannot be 100years or 20 years?
Thanks.
Hi,
How to solve the Etabs installation problem.
Thankshttps://files.engineering.com/getfile.aspx?folder=538714db-b21c-429f-9773-05d83ef3fac6&file=etabs.jpg
Dear All,
I need to add steel plate at the existing truss member to strengthening the truss in order to cater additional load.
The new steel plate will be welded to the existing rectangular hollow section (RSH). The existing truss member is 2.5m in length.
60mm welding length only is required...
Dear All,
I need to add steel plate at the existing truss member to strengthening the truss in order to cater additional load.
The new steel plate will be welded to the existing rectangular hollow section (RSH). The existing truss member is 2.5m in length.
60mm welding length only is required...
Dear All,
May I know, what is the structure design live load for the data centre for office? Kindly provide references or calculation to justify.
Thanks.
Most of them said the reinforced concrete pile is the settlement pile & bored pile will be non-settlement pile.
What is the difference for the both system?
Thanks.
Dear All,
When the high concrete strength columns and normal concrete strength beam, have British code mention how much should extend from column surface by high concrete strength in beam/ slab ?