Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. raa2125

    VR stamps applied at the same time with V/NB stamps

    Thank you for your reply. My undestanding is that VR stamp is not necessary when the repair is carried out before the application of V and NB stamp. The repair was carried out 2018 while the test was 2019. The nameplates with stamp VR and V/NB were installed at the same time after the test.
  2. raa2125

    VR stamps applied at the same time with V/NB stamps

    Dear Gentlemen, Safety Valves were delivered to site (and installed) without V and NB stamps on the nameplate due to the reason that it will be tested on site (set pressure). Repair/parts replacement was carried out on the valves before the test due to the leak observed in the other units...
  3. raa2125

    I have a deaerator and a storage ta

    Dear Mohamed, See attached interpretation in support to the interpretation provided by david. regards,
  4. raa2125

    I have a deaerator and a storage ta

    Dear Mohamed, See attached file extracted from Section 8. regards
  5. raa2125

    Boiler Tube welding

    Hope it could help.
  6. raa2125

    Test result of safety valve using lifting assist device compare with actual popping pressure

    Dear Daniel, Before I saw your message, we are actually discussing the same thing, that is to test using two different boiler base pressure. It makes us more interested after I saw your message and shared it with my colleague. Thank you very much, raa2125
  7. raa2125

    Test result of safety valve using lifting assist device compare with actual popping pressure

    Dear Dhurjati Sen, I read thru the link you sent. This procedure may not be advisable to our boiler. Here, we used the hydraulic lift assist device. Our boiler is supercritical with MAWP stamp on the nameplate as "26.7Mpa". Maxium set pressure we have is over 31 Mpa. It may be dangerous to...
  8. raa2125

    Test result of safety valve using lifting assist device compare with actual popping pressure

    Dear gentlemen, In one of the audit of local authorities on the on-going boiler erection, they raised a question regarding the safety valve as follow; "How could you confirm if the test result of safety valve using lift assist device is the same with actual popping pressure". We could not...
  9. raa2125

    Repair and Alteration to NB Registered Power Boiler

    hacksaw and mk3223, I think I am enlightened by your responses. Thanks to both of you. Regards,
  10. raa2125

    Repair and Alteration to NB Registered Power Boiler

    hacksaw, YES to which question below? (a), (b) or both (a)&(b). The client/owner question is,(a)is it mandatory that any repair/alteration in future be an R or UV stamp? (b) Or they could use an NBIC (Repair and alteration) as a guide without the application of R or UV stamp? Can you cite any...
  11. raa2125

    Repair and Alteration to NB Registered Power Boiler

    Dear Dhurjati Sen, Thank you for your suggestion. We always told them that its out of the construction scope and they should check their local regulation. But sometimes we cannot say no to the clients request, so we have to look any provision in the code or interpretation for their reference...
  12. raa2125

    Repair and Alteration to NB Registered Power Boiler

    Dear Gentlemen, We erected a power boiler and applied "S" Stamp after the hydrotest. Local regulation (in one of Asia country) requires newly constructed power boiler or parts be regsitered in National Board. This requirements had been satisfied by us (boiler manufacturer). The client/owner...

Part and Inventory Search