Dear experts
In my project , equipment nozzle of 22mm thickness with stud connection ( field weld) delivered to site with U stamp .Contractor carried out welding with piping as per project ITP and want to claim the first circumfertial joint belongs to piping code .
1. As per U-1 (e)(1) (a)...
Experts ,