  1. treg

    500 year flood data

    You might try the state department of water resources, or the state enineer, or the division of dam safety. It might be stated as a fraction of the probable maximum percipitation (PMP).
  2. treg

    Dozers towing Haul Trucks

    Why not push rather than pull?
  3. treg

    Spillway Calculation

    At 80 acre-feet of storage and 20 ft. height, you are definately geeting into more than the typical farm pond. You need someone experience in dam design to help you out. You will probably also be getting into permitting issues, so the agency will probably require a P.E. certification.
  4. treg

    Coal as backfill a bad idea?

    Coal will degrade with water, and, will tend to burn when loose. Coal steam plants usually figure 30 - 90 days max. in a compacted stockpile before the coal ignites.
  5. treg

    Topsoil Substitute

    I don't know of any rule of thumb. You will have to convince your regulators that what you want to use is at least as good of a growing medium as the topsoil. You will probably need to get a biologist, agronomist, or such involved.
  6. treg

    time of concentration

    In the work I've done, Time of Concentration would be calculated for each subwatershed. In your example, it would be across the lawn to the gutter. Travel time would be calculated to the catch basin. Calculations for outlet works downstream of the catch basin would be calculated based on the...
  7. treg

    Earthwork Equipment Capacities

    Mabn is right. If I want to be conservative in fleet sizing, I will use 90% of the 2:1 capactiy, but I have often found the the equipment capacity is even more the the rated volume capacity. Be sure to check the material weights, and not overload the equipment based on weight capacity.
  8. treg

    Scrapers vs Trucks

    Check with Caterpiller. They do theses types of analysis routinely.
  9. treg

    Proper placement of Emergency Spillway for Basin

    I agree that, if possible, the emergency should be located over native material. If the spillway is located over the embankment, any erosion of the spillway will erode your emankement. Failing that, it should be well armored. It has also been my experience that basins do not get removed when...
  10. treg

    Cost of Blasting

    You might try contacting an explosives manufacturer, such as DuPont or Atlas.
  11. treg

    Finder's Fee

    I know that on at least some occasions, doctors have paid refferal fees to other doctors. Why is this o.k. for an M.D., but not a P.E.
  12. treg

    Private Drainage in R/W

    You can determine what the flows whould have been under various rainfall conditions pre and post development of either lot. Ultimately though, you should be discussing this with the city attorney before having any discussions with the land owner about responsibility.
  13. treg

    Maximum grade to prevent drag boat trailers

    Is the actual grade the problem in dragging a trailer, or the change in grade?
  14. treg

    Earthwork Balance Calculations ª Subsidence

    In many parts of the country, subsidence refers to collapse of the surface due to underground extraction, such as mining. In your instance, the geotehnical engineer may be refering to voids caused by some other activity. You should contact the preparer of the report to understand what he means.
  15. treg

    flat area hgl

    You didn't say what the required storm is. If the requirement is for the 10 yr storm, I sould guess using the 25 yr storm would give you more than enough safety factor.
  16. treg

    AC Pipe Abandonment in place

    Check with an oil well service company such as Haliburton. They have done things like this before.
  17. treg

    Pipe sizing

    For culverts, there are pipe flow nomographs availabe. The ones I use I obtained from the Kentucky Higway Drainage Manual. I suspect most state highway departments will have something similar. Your culvert manufacturer should also have something. For a riser, I generally use the a...
  18. treg

    Spillway Criteria

    The Department of Water Resources, Division of Dam Safety would be the governing body. They do not regulate dams under 6 ft. high. Embankments that fall under their jurisdiction are required to be designed to pass the 1,000yr. storm. I thnik that is a little too much for this instance. Thanks
  19. treg

    Spillway Criteria

    I am looking for guidance on selecting the proper storm for spillway design. The embankment will be 3 or 4 foot high. Probably about and acre. It seems to fall under any state requiements for permitting.
  20. treg

    SEDCAD

    Try Dr. Richard Warner @ the University of Kentucky. I believe he was a co-author of the program.
Back