  1. mw25

    Nameplate placement

    To add to Larry617's points, nameplate should be permanantly attached to the vessel so that it cannot be removed without wilfull destruction.
  2. mw25

    Welding after hydrotest

    Dear metengr, Why do you think AI should be consulted for this? Only reason i could think is, this additional attachment may affect structural integrity of vessel. Just curious. Thanks.
  3. mw25

    pre-NDT paint removal

    I think this should be acceptable.
  4. mw25

    ASME Stamps & new owner

    Yes, existing stamps can be used for continuing operation if there is no change of name of the company. In case of name change, same can be done at a nominal charge from ASME and national board.