Search results for query: *

  1. pmover

    How to prepare piping class document?

    to supplement Snickster posting . . . the Valve codes on the pipe spec sheet refer to Valve data sheets that provide valve specifications. For example, valve type, materials of construction for each valve component, valve bonnet/body, size, end connection type, service temp range, applicable...
  2. pmover

    Reciprocating compressors

    no process data to work with . . . theoretically possible with motor shafts extending from both ends of motor. 1st 2 stages at one end and 2nd 2 stage on other end using clutches. but i doubt you will find a manufacturer or packager to build one. most likely a specialized case. i have seen...
  3. pmover

    Weld-o-let on elbow

    Agree, the elbow fitting is altered; hence, it needs to be qualified. Yes, i have observed locations where fittings are altered, whether or not the fitting was qualified, i have no idea. Fyi, elbolets are made for this purpose.
  4. pmover

    Reciprocating Compressor Pulsation Control Design requirements

    pencwo, do not duplicate your postings, a site policy. best to keep posting in "gas compression" forum.
  5. pmover

    Pipe Bracing for Tall Building Sway

    agree w/ LI. you won't find a code. consider this reference as a guide: https://wbdg.org/FFC/DOD/UFGS/UFGS%2023%2005%2048.19.pdf
  6. pmover

    Twin Lobe Blower taking Extra Amp Problem

    are blowers in parallel operation with equal resistances in piping? if parallel operation, and pipe resistances/lengths to common outlet pipe are not the same, the motor with greater resistance may need the additional amps to overcome the increase head.
  7. pmover

    Gas pipeline venting flow calculation

    "pipeline has no gas flow. Hence pigging is planned by venting the gas at receiver end. . ." not feeding gas into pipeline at location where pig is inserted, your method will not work as there is likely insufficient gas to expand to push pig along the pipe.
  8. pmover

    Pipeline Fire near Houston, TX

    "I'm sure the pipeline companies are going to reevaluate how they secure these valve stations near populated areas." Agree! in early 90's, my employer did this evaluation and resulted in some locations with block walls & others with bollards. In my travels about the usa, i have seen several...
  9. pmover

    Copper Content in SA-182 F316L Flanges – Compliance and Concerns

    "Has anyone else encountered F316L flanges with copper content?" NO any MTR that i reviewed and did not comply with the standard was rejected. "Is this a known issue with certain suppliers or manufacturers, and how have others in the industry handled similar situations?" Not that I'm aware...
  10. pmover

    Calculating Insulation Heat Loss?

    all you need is steam temperature, pipe size, pipe length, & pipe wall thickness to determine heat loss. personal protection is more important; hence, insulation is applied.
  11. pmover

    Steam Blowout Target

    to supplement LI post, i'm thinking something like a cyclone separator that is mounted in boiler steam drums. this would allow the "slag" material to fall out and allow steam to vent to atmosphere. however, this cyclone separator does not have a "target" per se. the "slag" material will...
  12. pmover

    Built on Wrong Property

    article . . . https://www.msn.com/en-us/money/realestate/a-hawaii-judge-ordered-the-demolition-of-a-house-after-a-california-woman-bought-a-vacant-plot-only-to-discover-the-building-on-her-land/ar-BB1p4Agp?ocid=mailsignout&pc=U591&cvid=e1b435f031a54f67ad3a88602c99f7a7&ei=48
  13. pmover

    Gas terminal piping integrity assessment

    to supplement previous posts, be sure of the appropriate pipe code. for gas pipeline transmission, B31.8 is the appropriate code.
  14. pmover

    Repeated Excel Calculation

    sure . . . in a column, the tank level is the variable. in the adjacent column, the tank heat loss is determined. in the rows below the first tank level value, have the same formula in column for tank heat loss using the tank level in same row. continue calc for as many rows as needed.
  15. pmover

    Importance of Exposure

    after spending 8+ years in operations, i joined an EPC firm and never regretted it. my fellow engrs were outstanding and competent in their field of expertise. Yes, there was a lot to learn, but that is life. i made several site visits to resolve construction and initial operating issues. I...
  16. pmover

    ASME B31.3 2024 Public Review Draft

    the 2nd link works great. Thank you!
  17. pmover

    ASME B31.3 2024 Public Review Draft

    please verify the link . . . I get "Incorrect file path. Please check back to the site".
  18. pmover

    Built on Wrong Property

    if there was a construction loan, the financial institution is liable. a construction loan should not be issued without the proposed survey/plot plan showing ownership. the financial institution, developer, construction company, etc. (all parties) should have obtained a proposed survey, plot...
  19. pmover

    Thermal oil boiler cracked tube

    replace tube. signs of excessive heat possibly due to poor circulation of fluid or direct flame.
  20. pmover

    Minimum Thickness of Flange for NPD30 Class 900 in ASME B16.47-2020

    Good observation! i suspect this is a typo and the ASME committee should be notified. Refer to page viii for interpretations. fyi, I've seen this before in AGA documentation which really baffled me for a month or so before i figured what transpired.