Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. dicksewerrat

    Ductile Iron Pipe - CP Rail ROW

    When they added CMP as a casing is when they lost me. That is not as strong as RCP or steel. If it is not under the track it should not be an issue. Find a contractor that has done work for CP Rail and see what they installed. Richard A. Cornelius, P.E. WWW.amlinereast.com
  2. dicksewerrat

    Salt building construction joint filler

    Leak seals in a parking ramp in Minneapolis is where I saw it. When you pour in real hot it soaks into all the little crevices. Works better on a hot July sunshiny day Richard A. Cornelius, P.E. WWW.amlinereast.com
  3. dicksewerrat

    Clack V3030-01

    Call the vendor. Richard A. Cornelius, P.E. WWW.amlinereast.com
  4. dicksewerrat

    Salt building construction joint filler

    Use beeswax, poured hot into the joint. Richard A. Cornelius, P.E. WWW.amlinereast.com
  5. dicksewerrat

    Designing a new suspended slab that won't leak

    Can "metal roof" be suspended below to catch any leakage? Steer it away from the lunch room. Make it cleanable. Richard A. Cornelius, P.E. WWW.amlinereast.com
  6. dicksewerrat

    Distance between pipes

    The pipes only have to be far enough apart for the most incompetent repair person, now or in the future. 3 feet should be enough for PVC. Richard A. Cornelius, P.E. WWW.amlinereast.com
  7. dicksewerrat

    Surveying; Leveling

    They probably have an App for that. Or get the 7th grade math book from a local school. Then retake your survey course. Richard A. Cornelius, P.E. WWW.amlinereast.com
  8. dicksewerrat

    Asphalt - Leveling Course

    Freeze-thaw is starting to unravel the the road. At a minimum, mill a 3 foot section on the CL , overlay that, then the entire road. Richard A. Cornelius, P.E. WWW.amlinereast.com
  9. dicksewerrat

    Dustcover With No Storage

    When you build a space more that 5 feet high, someone will use it for storage. They will put all the paper files generated in the office up there. File cabinets are very heavy 10 - 20 reams of paper per file drawer, 4 drawers per file, 4-5 square feet per file cabinet. 50 psf would not be a...
  10. dicksewerrat

    Siphon flow sizing

    Cut up a catch basin grate and lay it over the inlet pipe. That should cut the flow. Cheap, simple. Save the other pieces. You may need them. Richard A. Cornelius, P.E. WWW.amlinereast.com
  11. dicksewerrat

    Recommendation for Coating to Protect Concrete Force Main from H2S Corrosion

    Call some local lining contractors. there are liners out there that will hold 100 psi. I know. I have been designing them for 20 years now. And there are new products out every couple years. We are are not allowed to sell our products here or I would be all over it. Richard A. Cornelius, P.E...
  12. dicksewerrat

    rock blasting

    Take videos and post. They don't let me blast anything anymore. Richard A. Cornelius, P.E. WWW.amlinereast.com
  13. dicksewerrat

    Asphalt - Leveling Course

    Mill and overlay. Richard A. Cornelius, P.E. WWW.amlinereast.com
  14. dicksewerrat

    maximum drop depth allowed in the sewage manhole

    Are you laying a new pipe? If so, put it in at the flow line of existing manhole. Dropping helps get the H2S to come out of the sewage. This will corrode your manhole. Another thing is that us guys that do or did go into live manholes don't like the "Drop Manhole" idea. Have to take a shower in...
  15. dicksewerrat

    Slab on grade design

    Not the greatest but when you live in the woods, even Kmart looks good. Richard A. Cornelius, P.E. WWW.amlinereast.com
  16. dicksewerrat

    rock blasting

    If you designate the area as a bomb practice site, you could get the US to help get the rock size down. Those 2,000 # bombs do a real good job of softening up most things. Richard A. Cornelius, P.E. WWW.amlinereast.com
  17. dicksewerrat

    Improper Roof Shedding of Rainwater

    I wonder if the roof is fine but the gutter is sloped wrong. Add a larger downspout to the end with more flow. Richard A. Cornelius, P.E. WWW.amlinereast.com
  18. dicksewerrat

    Scour Around Wide Flange Pile Foundations for Solar Array

    The 1000 year flood may come. But I thought Noah didn't do a scour study on the Ark. County review team doesn't have enough to do. Richard A. Cornelius, P.E. WWW.amlinereast.com
  19. dicksewerrat

    Scour Around Wide Flange Pile Foundations for Solar Array

    Put a section of pipe around each WF pile. Fill with concrete. Use the round calculations. Richard A. Cornelius, P.E. WWW.amlinereast.com
  20. dicksewerrat

    RCP - Placing rock or grouted stone directly on top of a pipe

    I guess I would not use "rocks" anywhere near the pipe. Only use these "rocks' in the top 3 feet of the levee. I would expect the levee to be a well compacted earthen structure. Richard A. Cornelius, P.E. WWW.amlinereast.com