    UK Grid problems 9th Aug

    The BBC is reporting widespread blackouts in London and the SE and I can see that a lot of emergency generation has started up (suggesting low frequency cut in). It'll be interesting to hear what happened and how low the frequency got. This is at least the 4th low frequency event so far this...
  2. LSpark

    VT specification for very low burdens.

    I've just had a look at one of our test certificates (400kV, class 0.2, 20VA unit) and there is a slight variation in accuracy (0.02% and 0.8min) when the burden of the other secondary is varied. That compares with a variation of 0.03% and 1 min between 25% and 100% burden for this VT. So the...
  3. LSpark

    VT specification for very low burdens.

    I look after high accuracy tariff metering systems so come across this problem regularly these days. I add a dummy burden in parallel to take the winding up to 25% burden. Where there are two secondaries I burden both up to 25% even when only one of them is used for tariff. Then you can use...
  4. LSpark

    Worst thing that can happen to a transformer?

    Was that a well known one in the UK Scotty? Remember that one well, we had to change all of our documentation to make sure that the difference between off load and off circuit was clear. The worst one I heard of was a transformer that had an internal fault during energisation that caused the...
  5. LSpark

    How many engineers support this activity ?

    When I was fresh out of university I did a lot of careers evenings for the IEE (as it was called then) and a few sessions in schools. There was very little support from the older engineers (who felt they were too old to be able to relate to the kids) so I got slightly disillusioned and once I...
  6. LSpark

    Import active energy vs. Export active energy

    I would understnad that to mean that import active energy is input into the module (such as a motor or load centre) and export active energy is output from the module (from a generator).
  7. LSpark

    Tree trunk worse than behind-the-wall?

    It looks like an extension lead rather than fixed wiring to me so probably not covered by the wiring regs. I suspect there are plenty of violations that weren't mentioned/photographed though!
  8. LSpark

    Online DGA: Manufacturers

    It's not my area of specialism but we switched from using Hydran to Calisto for our (European) GSUs due to on going maintenance costs. I was on the operational side when I was site based so don't know how easy or hard it was to intergrate into our SCADA network. We used to get a single value...
  9. LSpark

    Generator Response to a Change in Grid Frequency

    The under excitation probably came up due to a change in power factor which pushed the machine (further) in to the lead. This will have happened due to changes on the grid which you AVR responded to so it maintained GT terminal volts. Under excitation does not mean low excitation, it means you...
  10. LSpark

    Mal Synchronising damage

    I can't link to any photos but we had a 7MW set synchronise out of phase a few years ago, the stator winding and core were both damaged (there were flashovers between the winding and core) and the turbine/gearbox coupling bolts failed causing consequential damaged and a fire. Not pretty, the...
  11. LSpark

    Generator capability whilst connected to national grid question

    I had reason to look through a connection agreement for one of our DNO connected sites (132kV) and that needs to run in PF control mode. That partiular site is design to run in island mode in case of loss of connection to the main grid, so any site with blackstart capability will need to be...
  12. LSpark

    Generator capability whilst connected to national grid question

    As the others have said the AVR maintains the generator terminal voltage and generally has negliable effect on the grid volts (we consider it to be an infintie busbar). In theory the high grid volts could occur at any of the tap positions of the step up transformer. I'm guessing you're UK...
  13. LSpark

    CT(current transformer) rated electric meter

    Generally metering CTs are more accurate than protection CTs (especialy at the lower values of current) but saturate at much lower currents. I'm responsible for a good few tariff metering circuits (UK based) that range from around 5MVA to 700MVA and most of those use class 0.2s CTs, some of the...
  14. LSpark

    The future of women in Engineering...

    Kenat - I'm on the bottom rung of management now and I can say with confidence that not just female engineers need encouragement and guidance! Graybeach - I don't think females in my company are paid less than men (apart from pro-rataing for part timers). I don't know if this is more common in...
  15. LSpark

    The future of women in Engineering...

    I'm not sure it will be much more palatable coming from a female engineer, at least that hasn't been my experience. I've been working in engineering for the last 18 years and have mainly kept clear of women only events as I don't agree with them. I've been asked why by some fairly senior...
  16. LSpark

    Potential transformers

    Can't help with the bearings but the most common failure mechanism for PTs in my company is shorted HV turns, occassionally catastrophic but normally picked by that phase reading high.
  17. LSpark

    GSU Tap changer control strategy - Review

    The OLTC on the plants (UK) I look at are usually operated manually in response to a request for a change in reactive power by the TSO. Where there are LV breakers and we import power back through the GSU the tap changers operate automatically to maintain the voltage on the unit auxiliary...
  18. LSpark

    CT accuracy at low current

    I use class 0.2s for high accuracy metering for circuits rated >10MVA. We order them to IEC 60044-1 (I'm in the UK), I guess there's an equivalent in the US. I have the luxury of using CTs that are dedicated for metering though.
  19. LSpark

    Black start Generator Versus Emergency Generator

    Most of the older power stations that have black start capability in the UK just have the open cycle gas turbines that can be used for black start or emergency power (connect on to an 11kV board) not two seperate engines. Most of the newer gas plants don't have black start capability (not...
  20. LSpark

    necessary condition for electrical engineerin in UK

    Most of our recent recruits now have masters degrees as the IET set the minimum requirement for becoming chartered as a master degree. Going back a few years the requirement was a bachelors degree and that was the norm when I joined the industry and is what most of the older engineers have...