  1. kashain

    Sewage Ejector Pump

    I will try the system suggested. Thanks.
  2. kashain

    Sewage Ejector Pump

    Mine is College facility. To Go Green, we use recycle toilet paper which is unfortuantely does not break down easily. What I need is how to suck the paper which is floating at the top of the pit and cut/discharge it.
  3. kashain

    Sewage Ejector Pump

    I was joking about to install a stirrer. What type of mixer you installed? How do you control the mixer,run with the pump?
  4. kashain

    Sewage Ejector Pump

    We install new grind ejector pump and still not able to suck/cut the tissue paper (raw or recycle). The tissue papers are floating and the pump is not sucking the tissue papers. Any suggestion?
  5. kashain

    Psycrometric Calcation Help

    The answer depends on what is the process from the point 1 to point 2.
  6. kashain

    Flexible Metallic Conduit

    Proper support is my concern. I see contractor dumping FMC into a congested hung ceiling, sitting on ceiling grid without any proper support. The cable is pulled when nobody around. That should be limited to shorter length and used for connection to equipment for flexibilty only.
  7. kashain

    Flexible Metallic Conduit

    Why FMC is allowed to be used without length limit?
  8. kashain

    Steel Deck for Equipment Support

    The CM and the Architect have no problems for the installation which I disagree. I will keep pushing. Thanks.
  9. kashain

    Fire/smoke damper required?

    You may fire rated the duct without providing fire smaoke damper.
  10. kashain

    Steel Deck for Equipment Support

    My elevator contractor uses the steel deck to support the transformer and elevator controller and claims that the support will be embedded in the concrete when the concrete is poured. How should I tell the contractor they are wrong and they have to remove the equipment and support the equipment...