Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. jakeatberkshire

    Can MS Project finish dates driven be driven by Excel data?

    Hi, I'm building a simple timeline projection system for an engineering department. We specialize in aerospace manufacturing and have a series of projects running at once. I'm taking data from the initial quote (time per operation, setup, assembly, etc) and working backwards from the delivery...
  2. jakeatberkshire

    Custom Feature Parameters Template [Drafting]

    Also, is it not possible to add dimensions into a Feature Parameters template? Just modify existing. I want to pull up drill hole diameter and drill hole depth on a threaded hole all in one callout instead of two separate ones [one thread features and one hole features].
  3. jakeatberkshire

    Custom Feature Parameters Template [Drafting]

    Thanks for the response Jerry. I am familiar with associative measurements and had considered them at first. By putting together a series of expressions into a single note, with the proper preformated text, it would achieve something close to what I'm looking for. This would take a bit longer...
  4. jakeatberkshire

    Custom Feature Parameters Template [Drafting]

    Hi All, I work at an aerospace manufacturing facility using NX6. We specialize in hydraulic distribution manifolds for a variety of applications. Many of our parts include industry standard ports and hole types. We have grip files set up and use custom software to guide the modeling of these...
Back
Top