SMIAH
Civil/Environmental
- Jan 26, 2009
- 482
I'm reviewing a plan showing 1H:1V rip rap that is about 2 m high.
The plan show that rip rap is "Crushed stones 300-500 mm (it can be dynamited rock)"
No filter (granular or textile) behind it.
I am skeptical about the fact that anything steeper than 1.5H:1V will be stable.
Am I wrong?
The plan show that rip rap is "Crushed stones 300-500 mm (it can be dynamited rock)"
No filter (granular or textile) behind it.
I am skeptical about the fact that anything steeper than 1.5H:1V will be stable.
Am I wrong?