cjccmc
Mechanical
- Oct 11, 2012
- 111
In attached sketch, I want to have the two .752 holes located +/- .004 dia to each other and perpendicular to datum A .001 dia. Then these two holes become datum B to locate the .252 dia hole. (We use model based definition where CAD file is queried to get dimensions that's why no dim are shown in attachment). Does what I show give me what I need in legal ASME 1994 terms? I was wondering if I need the ref to datum A in the TP frame. It doesn't seem to mean anything but I'ver never seen TP without ref to at least one datum. Thanks for the help.