aaronPTeng
Structural
- Oct 14, 2013
- 62
Anyone had any experience in design of a 25m clear floor span where form work is not possible? (note second direction is only 8m)
I am looking at either Precast T sections? or steel trusses in main direction with a precast flooring system in the second direction between the trusses?
Any ides appreciated!
"Structural Engineering is the Art of moulding materials we do not wholly understand into shapes we cannot precisely analyse, so as to withstand forces we cannot really assess, in such a way that the community at large has no reason to suspect the extent of our ignorance." Dr. Dykes, 1976
I am looking at either Precast T sections? or steel trusses in main direction with a precast flooring system in the second direction between the trusses?
Any ides appreciated!
"Structural Engineering is the Art of moulding materials we do not wholly understand into shapes we cannot precisely analyse, so as to withstand forces we cannot really assess, in such a way that the community at large has no reason to suspect the extent of our ignorance." Dr. Dykes, 1976