Hi,
I'm trying to determine zero-sequence data for a 3winding trafo 220kV/110kV/10kV Ynynd5 250MVA ABB transformer to put into PSSE.
In the transformer test sheets, under zero-sequence tests, there are 4 sets of numbers (Z, R, X):
HV with LV open -
HV with LV shorted
LV with HV shorted
LV with HV open
What is confusing us is that there is no mention of the tertiary - is it open or shorted in these tests? Can I use the much-cited formulae Zp = 1/2(Zps + Zpt - Zst) etc? And if so, which set of data should I leave out - are two of the above four sets of data essentially the same?
Thanks in advance for any help.
I'm trying to determine zero-sequence data for a 3winding trafo 220kV/110kV/10kV Ynynd5 250MVA ABB transformer to put into PSSE.
In the transformer test sheets, under zero-sequence tests, there are 4 sets of numbers (Z, R, X):
HV with LV open -
HV with LV shorted
LV with HV shorted
LV with HV open
What is confusing us is that there is no mention of the tertiary - is it open or shorted in these tests? Can I use the much-cited formulae Zp = 1/2(Zps + Zpt - Zst) etc? And if so, which set of data should I leave out - are two of the above four sets of data essentially the same?
Thanks in advance for any help.