SELEC
Electrical
- Nov 12, 2005
- 64
I have a prolem here. The switchgear company has purchased all the fuses for their use based on the co-ordinaation study they did inside their switchgear, but the 57X curve is way above our upstream overcurrent protection curves. Even above the transfirmer curve. This means, this fuse is useless for the overload protection. Can we allow this? It is a tough decision to make. Who has a better solurtion for this problem?