Hello,
My facility has a wet sprinkler system that serves a shopping mall and a commercial building housing offices.the mall and the building share the same structure and the mall's basement houses the fire pumps.the building's basement is one level above the fire pump room's level and it here that the main header terminates.the mall's basement and the building's basement are partitioned and the main header,after serving the mall's basement Alarm check valve assemblies/sprinklers,terminates in the building's basement.there are 4 alarm check valve assemblies in this bbuilding's basement out of which 3 serve the parking lot via pendent and upright sprinklers and one particular ACV(tagged ACV-D) is for protecting the 20 floors(every floor has a floor control/isolation valve assembly).
the alarm check valve assemblies in the building;s basement had remained inactive for the past 2 years i found many components missing.pipes were rusted,hangers missing.ACV-D was inactive too with its OS & Y valve closed,check valve's external by-pass dead,no water motor alarm gong etc...the system side(sprinkler side) of the ACV-D was found being pressurized by the overhead water tank.i,e the riser downstream the alarm check valve asembly -D terminated in the overhead tank and there was a BUTTERFLY valve up at the top that seemed to serve as an isolation valve.in each floor there are isolation valves without flow switches and pressure regulating valves.
i am tasked with activating this buildings's fire system,from the basement to the top floor. how do i go about this? i will have to do flushing,selection,procurement and installation of mising items,adjustment settings of pressure relief/regulating valves etc.
My facility has a wet sprinkler system that serves a shopping mall and a commercial building housing offices.the mall and the building share the same structure and the mall's basement houses the fire pumps.the building's basement is one level above the fire pump room's level and it here that the main header terminates.the mall's basement and the building's basement are partitioned and the main header,after serving the mall's basement Alarm check valve assemblies/sprinklers,terminates in the building's basement.there are 4 alarm check valve assemblies in this bbuilding's basement out of which 3 serve the parking lot via pendent and upright sprinklers and one particular ACV(tagged ACV-D) is for protecting the 20 floors(every floor has a floor control/isolation valve assembly).
the alarm check valve assemblies in the building;s basement had remained inactive for the past 2 years i found many components missing.pipes were rusted,hangers missing.ACV-D was inactive too with its OS & Y valve closed,check valve's external by-pass dead,no water motor alarm gong etc...the system side(sprinkler side) of the ACV-D was found being pressurized by the overhead water tank.i,e the riser downstream the alarm check valve asembly -D terminated in the overhead tank and there was a BUTTERFLY valve up at the top that seemed to serve as an isolation valve.in each floor there are isolation valves without flow switches and pressure regulating valves.
i am tasked with activating this buildings's fire system,from the basement to the top floor. how do i go about this? i will have to do flushing,selection,procurement and installation of mising items,adjustment settings of pressure relief/regulating valves etc.