Hi
I'am reading the AISC 'specification for steel structural buildings 2010' (ASD), and find chapter J.3 a bit confusing when it comes to bolt pretension and tensile strength.
So my question is:
Why is the minimum bolt pretension set to 0.7*Fu according to table J3.1 and allowable tensile strength set to Fu/omega = 0.5*Fu as in equation J3-1? It seems like the bolt pretension force is higher than the allowable tensile force. But that doesn't make sense, so I hope that someone at this forum can help me understand.
Thanks
I'am reading the AISC 'specification for steel structural buildings 2010' (ASD), and find chapter J.3 a bit confusing when it comes to bolt pretension and tensile strength.
So my question is:
Why is the minimum bolt pretension set to 0.7*Fu according to table J3.1 and allowable tensile strength set to Fu/omega = 0.5*Fu as in equation J3-1? It seems like the bolt pretension force is higher than the allowable tensile force. But that doesn't make sense, so I hope that someone at this forum can help me understand.
Thanks