I'm reviewing a cost estimate, where the estimator assumed that the cost of the connections would be 30% of the structural steel cost. There are no moment connections, everything is connected with simple shear connections. This is a two-story structure; total height is about 44' above ground.
The 30% seems high to me.
What are other's opinions regarding a cost allowance for simple shear connections?