82264
Mechanical
- Mar 10, 2003
- 6
I would like to know what things to consider before we can do alteration works to a Blowdown tank. The blowdonwn tank is ASME coded and the alteration that is going to do is to add additional 1 piece of nozzle.
Thanks
82264
Thanks
82264