metboss
Petroleum
- Sep 12, 2012
- 152
We have received Drilling Conductor pipes 36" WT-1.5” Grade API 5L X-56, SAW, PSL-2 with threaded connection (box and pin) and during inspection, we found one pin connector (external threaded) has been damaged. After consultation with the manufacturer, the only method of repair is to completely cut off the damaged Pin and replace this with a welded Pin connector. Now, supplier has received the new Pin from manufacturer, but they require our acceptance of this method of repair.
Can we accept such repair? If we accept, what precautions shall be taken during welding? (note: C-seam and L-seam will overlap). Any pre-heating or PWHT is required? What NDT methods shall we apply?
Please advise..
Can we accept such repair? If we accept, what precautions shall be taken during welding? (note: C-seam and L-seam will overlap). Any pre-heating or PWHT is required? What NDT methods shall we apply?
Please advise..