Guys,
I'm running into some resistance when I try to justify why I do not want electrical/process equipment inside the dike walls around tanks. We need a run down cooler to cool some condensate and
"they" want to place these coolers inside the dike. Every site I have worked this has not been done, and looking through API 650 and RP 500 I cannot seem to find a justification to prevent this. Is this practice just a good plant construction rule of thumb or is there a standard I can fall back on? Thanks for your experiences and your input.
DR
Project Manager.
I'm running into some resistance when I try to justify why I do not want electrical/process equipment inside the dike walls around tanks. We need a run down cooler to cool some condensate and
"they" want to place these coolers inside the dike. Every site I have worked this has not been done, and looking through API 650 and RP 500 I cannot seem to find a justification to prevent this. Is this practice just a good plant construction rule of thumb or is there a standard I can fall back on? Thanks for your experiences and your input.
DR
Project Manager.