Analysis of the Artemis I flight, not exactly NASA's finest moment, although it may be that I just haven't seen this sort of report before.
To ensure the safety of the crewed Artemis II mission, we recommended the Associate Administrator for Exploration
Systems Development Mission Directorate: (1) ensure the root cause of Orion heat shield char liberation is well understood
prior to launch of the Artemis II mission; (2) conduct analysis of Orion separation bolts using updated models that account
for char loss, design modifications, and operational changes to Orion prior to launch of the Artemis II mission; (3) require
EGS conduct additional verification and validation for launch imagery equipment prior to launch attempts should launch
conditions change; (4) reexamine procedures to better ensure recovery of Orion jettisoned hardware for the Artemis II
mission; (5) develop a corrective action plan to mitigate or prevent the recurrence of uninterpretable Orion telemetry data
for the Artemis II mission; and (6) establish a course of action and timeline for individual Artemis system design changes
before beginning integrated system assembly stacking operations.
Cheers
Greg Locock
New here? Try reading these, they might help FAQ731-376
To ensure the safety of the crewed Artemis II mission, we recommended the Associate Administrator for Exploration
Systems Development Mission Directorate: (1) ensure the root cause of Orion heat shield char liberation is well understood
prior to launch of the Artemis II mission; (2) conduct analysis of Orion separation bolts using updated models that account
for char loss, design modifications, and operational changes to Orion prior to launch of the Artemis II mission; (3) require
EGS conduct additional verification and validation for launch imagery equipment prior to launch attempts should launch
conditions change; (4) reexamine procedures to better ensure recovery of Orion jettisoned hardware for the Artemis II
mission; (5) develop a corrective action plan to mitigate or prevent the recurrence of uninterpretable Orion telemetry data
for the Artemis II mission; and (6) establish a course of action and timeline for individual Artemis system design changes
before beginning integrated system assembly stacking operations.