enfsgi
Structural
- Sep 19, 2011
- 8
Does anyone know the rationale behind this - W/50 slope? Example: 1/4:12 roof pitch = 1.19 degrees. W = 60 eave to ridge, W/50 = 1.2. Slope is less than 1.2 so surcharge is added. Same roof, W =55, W/50 = 1.1. Slope is now greater than 1.1 thus surcharge is not required. Seems there is a magical length for each roof pitch when this must be considered. Is this correct or is there something I have misinterpreted?