Hello, I checked a girth flange of a heat exchanger in accordance with ASME VIII div1 appendix 2, as per project specification and everything is verified, but if I check the flange with ASME PCC-1 appendix O as well, the verification isn’t ok.
Bolts are not enough to seat the gasket.
In this case ASME PCC calculation isn’t required for the project, but does it mean that this flange will have leakage problems of sure?
There are several projects where PCC is not required and this means to design a flange with lower thickness and bolts with small size with appendix 2 only, but in these cases pcc could be verified or not.