whizzkas
Mechanical
- Jan 21, 2003
- 5
A reactor manufacturer has requested a "User Design Specification" UDS, in order to supply a reactor with a "U" stamp. What is a UDS?, the manufacturer already has a design specification issued by the engineering contractor.HELP
Whizzkas
Whizzkas