Paul26
Mechanical
- Aug 15, 2017
- 4
Does an ASTM standard exist, across any industry, for a duration before components need to be NDTed?
For instance, if I have a machine that has a maintenance schedule which requires magnetic particle testing (MT) of a specific area once yearly, I am trying to find out if there are any existing standards that can be applied to said machine which would have say 10% of machined components sampled and 5% of welded components sampled and MT or PT tested after say 18,000 operational hours or 10 operational years. This would be on top of the regular annual maintenance.
If no such standards exist, does anyone know of a similar standard for any industry which I may reference? It can reference operational hours, years, cycles, etc.
Many thanks.
For instance, if I have a machine that has a maintenance schedule which requires magnetic particle testing (MT) of a specific area once yearly, I am trying to find out if there are any existing standards that can be applied to said machine which would have say 10% of machined components sampled and 5% of welded components sampled and MT or PT tested after say 18,000 operational hours or 10 operational years. This would be on top of the regular annual maintenance.
If no such standards exist, does anyone know of a similar standard for any industry which I may reference? It can reference operational hours, years, cycles, etc.
Many thanks.