We have an open excavation (50' x 25') that needs to be backfilled. It has filled up with rain water so the soil is generally saturated. We can pump out most of the water but is there a concern for for the satuarated soil? Eventually there will be a structure in the area but we don't anticipate being ready for foundations for another year. The area would be re-excavated at the time.
The excavation is 6-9' deep.
The excavation is 6-9' deep.