jjalex1
Structural
- Jan 3, 2012
- 22
I have a project in which a section of a concrete barrier (+/- 10') will be cut out for a tench to replace a hydrant lateral.I have another project that will eventually replace the barrier in its entirety but that won't be for another 6 or months or so after this trenching project ends. I have to put in a temporary barrier plate or possibly fill with concrete. What is the design procedure for a temporary barrier plate and, is there a better option?
Thanks
Thanks