Fellow engineers,
I have a beam on top of wall (as shown in attachment). What should be the methods of checking this beam and wall? There is a column on top of it at every 5 meters and a transverse wall also at every 5 meters. The beam is on top of wall throughout its wall length.
I was task to check if the size and its reinforcement are still adequate using the provisions of ACI-05.
Pls. advise.
I have a beam on top of wall (as shown in attachment). What should be the methods of checking this beam and wall? There is a column on top of it at every 5 meters and a transverse wall also at every 5 meters. The beam is on top of wall throughout its wall length.