kkp3456
Petroleum
- May 14, 2011
- 10
We have a neutralisation basin which supplies fresh caustic (20% conc.) to gas scrubber & the return line comes to basin. Now within one year the return pipeline failed 3 times at different locations near to basin & the failure was not on the joints but in pipe itself. Failure is in form of pinhole in pipeline. The process study shows the pH value for the return service is 4 (which is acidic). The whole pipeline is A53 GrB designed for 20 % NaOH @ 0 degC.
Kindly suggest any solution?